U.s. Government - Nuclear Energy, Power Plant, And Reactor Sourcebook: 1990s Controversy About Refueling At Millstone Plant And Alleged Discrimination Against Engineers ... About Spent Fuel Cooling

Nuclear Energy, Power Plant, And Reactor Sourcebook: 1990s Controversy About Refueling At Millstone Plant And Alleged Discrimination Against Engineers ... About Spent Fuel Cooling por U.s. Government epub

Descargar Nuclear Energy, Power Plant, And Reactor Sourcebook: 1990s Controversy About Refueling At Millstone Plant And Alleged Discrimination Against Engineers ... About Spent Fuel Cooling por U.s. Government Epub y PDF

  • Título: Nuclear Energy, Power Plant, And Reactor Sourcebook: 1990s Controversy About Refueling At Millstone Plant And Alleged Discrimination Against Engineers ... About Spent Fuel Cooling
  • Autores: U.s. Government
  • Publicado: 17 de febrero de 2015
  • ISBN: 0
  • Tamaño: .MB
  • Nº de páginas: 215
  • Idiomas: Español
  • Editorial: www.fapermex.mx
  • Valoración: ★★★★★
  • País: España
  • Genero: Novela kindle
  • Comprimido: no
  • Formato : PDF, EPUB

U.s. Government con Nuclear Energy, Power Plant, And Reactor Sourcebook: 1990s Controversy About Refueling At Millstone Plant And Alleged Discrimination Against Engineers ... About Spent Fuel Cooling

This is a print replica reproduction of multiple official documents from the Nuclear Regulatory Commission (NRC) regarding a well-known controversy in the late 1990s regarding safety violations during refueling operations at the Millstone Unit 1 reactor, and allegations by senior engineers of discrimination resulting from disclosure of the safety issues. Contents include: NRC Handling of Issues Related to Refueling Operations at Millstone Unit 1; Office of the Inspector General Event Inquiry NRC Failure to Adequately Regulate Millstone Unit 1; Report of Investigation - Millstone Unit 1 Alleged Discrimination Against a Senior Engineer for Raising Safety Concerns Regarding Spent Fuel Pool Cooling (George Betancourt); Report of Investigation - Millstone Unit 1 Alleged Discrimination Against a Senior Engineer for Raising Safety Concerns Regarding Spent Fuel Pool Cooling (George Galatis). There are also some related documents regarding NRC policy on handling discrimination issues and similar matters.Bonus documents are also included: Citizen's Guide to U.S. Nuclear Regulatory Commission Information, 2016 Congressional Budget Justification, Status Report on U.S. Nuclear Energy Program.The NRC Office of the Inspector General (OIG) initiated an inquiry based on concerns by Northeast Utilities (NU) Senior Engineer George Galatis and his attorney, Ernest Hadley, about the NRC's handling of issues associated with refueling practices and the operation of the spent fuel pool at the Millstone Nuclear Power Station, Unit 1. The issues pertaining to NU's refueling practices were first identified by Galatis who notified NU management in 1992 that the practice of offloading the full core during refueling outages was outside the Millstone Unit 1 design basis and a violation of the Millstone Unit 1 operating license. The design basis issue was previously addressed by OIG in event inquiry 95-77I, dated December 21, 1995. During this event inquiry, OIG reviewed how and when the NRC addressed the safety concerns raised by Galatis. To accomplish this, OIG examined documents relevant to Galatis' allegations such as NRC inspection reports. OIG also interviewed NRC staff and licensee employees who worked to address these health and safety issues. OIG determined that there were delays by the NRC in addressing technical concerns raised by Galatis. Further, OIG determined that Region I technical staff did not interview Galatis about his April 26, 1994, allegations regarding NU's operation of the spent fuel pool at Millstone Unit 1. The only interview of Galatis involving a member of the NRC technical staff took place on May 19, 1995, when a Region I project engineer provided technical assistance during an NRC Office of Investigations (OI) interview. OIG learned that the concerns raised by Galatis to NU management resulted in issuance of a Licensee Event Report (LER 93-11), dated October 18, 1993. In this LER, NU indicated that it typically performed full core offloads during refueling outages at Millstone Unit 1. NU also described a full core offload scenario that was beyond the design basis of the plant. At the time of LER 93-11, Millstone Unit 1 had conducted 13 refueling outages.
El sitio www.fapermex.mx le ofrece descargar el libro Nuclear Energy, Power Plant, And Reactor Sourcebook: 1990s Controversy About Refueling At Millstone Plant And Alleged Discrimination Against Engineers ... About Spent Fuel Cooling gratis o leerlo directamente en el sitio en línea. Con nosotros puedes encontrar miles de libros de una amplia variedad de géneros: fantasía, detectives, novelas, fantasía, prosa, thrillers, aventuras. En cada categoría son solo los mejores libros. Asegúrese de que tendrá mucho para elegir! Todos nuestros libros están disponibles para cualquier usuario. Simplemente visite nuestro sitio web y seleccione su libro favorito.